Conditions for ordering:
Some of the most important conditions:
Payment methods:
If the order is NO MONTAJE:
- 40 PER CENT PAGA AND SEÑAL (PPTATION)
- 60% TO FÁBRICA'S FACILITY
If the order is CON MONTAJE:
- 40 PER CENT PAGA AND SEÑAL (PPTATION)
- 60% TO FÁBRICA'S FACILITY
- OF THE IMPORTE OF THE LAST PAGO DECUENTA 1000€, THAT WILL BE TAKEN IN METÁLICO TO MONTERS IN FINALIZE THE MONTAJE
Entity: BANC SABADELL
No account: ES41 0081 0054 19 0001277432
Entity: BANCO SANTANDER
No account: ES84 0049 2014 11 2214022634
Beneficiary name: INFINITY HOUSE SPAIN, S.L.
Payment reference: Indicate non-budget
General conditions:
Customer responsibility:
- If the company Infinity House Spain, S.L. delivery and mounting the booth, the customer has to provide the right access to material handling and transportation, where the booth will be built. (Dimensions of the long crane 8m and width 3m). If it is not possible to enter the customer's site or client has not informed the company of Infinity House Spain, S.L. , the additional costs of the delivery are in charge of the customer.
- In case the transpore is unable to download the material at the assembly point, the customer will be responsible for moving the material to the assembly point.
- The customer has to supply the 220V power outlet with 15th. In the event of lack of light, the customer must have an generator of 5000 W in the assembly area. If the customer has not informed the company Infinity House Spain, S.L.. , the inactivity costs in the assembly process will be in charge of the client.
- In the event that the concrete base has built the client, Eurocasetas is not responsible for the construction itself the concrete base must be built according to the plan presented by Infinity House Spain, S.L.
- The concrete base should be leveled with an acceptable difference +/- 1 cm. If the base does not meet our standards, Infinity House Spain, S.L. the assembly process will not begin. Inactivity costs in the assembly process will be charged by the customer.
- If in the process of assembly, and because of the client it is not possible the continuity of the assembly, and the wood is exposed to the average environmental influences (floods, wind, sun, humidity etc.) Infinity House Spain, S.L. do not cover the guarantees of such products, and will not be responsible for the house built and delivered. (for example, the client's fault – does not have the premises of work.)
- In the case that the treatment of the wood of the house, is done by the customers, the customers are warned that such treatment has to be carried out in a period between 2 to 15 days after the assembly, to protect the wood. If the cassette is not painted according to our rules, the cassette loses the guarantee.
- The company Infinity House Spain, S.L. inform the client that the City Council permits for the installation of any booth will run by the client. That in this way it is reported and that in any case it is unique and exclusive responsibility of the client. Likewise, the company will not be obliged to refund any money in the event that the customer does not comply with these permits.